We have gone
3428
days since our last lost time or reportable accident
Twitter
Youtube
Linkedin
Intranet
+44 (0) 113 2555 666
sales@winder.co.uk
About
About Winder Power
History
Board of Directors
Group Structure
Accreditations
Tax Policy
Products
Power Transformers
Distribution Transformers
Reactors
Air-Cooled & Cast Resin Transformers
Factory Refurbishment
On-Site Refurbishment
Switchgear & Instruments
Eco Transformers
Permanent Magnet Generators
Excitation, Rotors and Stators
Bespoke Alternators and Generators
Repairs and Rewinds
Menu Item
Menu Item
Menu Item
Services
Transformer Installation & Relocation
Transformer Servicing & Maintenance
Testing & Commissioning
On-site Transformer Cleaning & Painting
On-site Transformer Refurbishment
Cooler Bank Replacement
Marshalling Kiosk Replacements
Cable Box & Bushing Replacements
Containerised Substations
HV & LV Cabling
Switchgear Installations, Servicing & Maintenance
Offshore & Global Transformer Maintenance
DNO Safety Document Acceptance
Applications
Applications
Power Generation
Rail Networks
Military
Case Studies
News
Vacancies
Contact Us
Menu
About
About Winder Power
History
Board of Directors
Group Structure
Accreditations
Tax Policy
Products
Power Transformers
Distribution Transformers
Reactors
Air-Cooled & Cast Resin Transformers
Factory Refurbishment
On-Site Refurbishment
Switchgear & Instruments
Eco Transformers
Permanent Magnet Generators
Excitation, Rotors and Stators
Bespoke Alternators and Generators
Repairs and Rewinds
Menu Item
Menu Item
Menu Item
Services
Transformer Installation & Relocation
Transformer Servicing & Maintenance
Testing & Commissioning
On-site Transformer Cleaning & Painting
On-site Transformer Refurbishment
Cooler Bank Replacement
Marshalling Kiosk Replacements
Cable Box & Bushing Replacements
Containerised Substations
HV & LV Cabling
Switchgear Installations, Servicing & Maintenance
Offshore & Global Transformer Maintenance
DNO Safety Document Acceptance
Applications
Applications
Power Generation
Rail Networks
Military
Case Studies
News
Vacancies
Contact Us
Perth, Scotland
See more Case Studies
Overview
Client:
Undisclosed
Location:
Perth, Scotland
Objective:
Installation & commissioning of 2 x 15/30MVA, 33/11.5kV power transformer
Scope of Work
Manufacture and testing of 2 x 15/30MVA, 33/11.5kV, KNAN/KNAF power transformers.
Full in-house routine and zero sequence tests.
Delivery, off-loading & assembly of both transformer, which was then lifted into position fully built at our customers site using a 500T crane.
Pre-commissioning works as per the customers specification by our Substation Services installation & commissioning team.
Description