This 132/33kV transformer was previously located at Winchester Grid as a spare transformer for the DNO, it is now ready for service in Amesbury after a full four week project, which included the following works:
Once the transformer arrived it was skidded onto the new plinth within the day and sat on new anti-vibration pads.